CONTENTS

    Steel Structure for PV Panel construction: 12 key process steps and pitfalls to avoid

    avatar
    Sherry
    ·July 15, 2025
    ·13 min read
    Steel Structure for PV Panel construction: 12 key process steps and pitfalls to avoid
    Image Source: pexels

    You can achieve a successful Steel Structure for PV Panel installation by following these 12 essential steps:

    1. Site survey

    2. Feasibility and location analysis

    3. Structural load assessment

    4. Modeling and code compliance

    5. Steel type and coating selection

    6. Procurement

    7. Soil analysis

    8. Foundation build

    9. Mounting structure installation

    10. Fastening and drilling

    11. Panel mounting and electrical setup

    12. Inspection and maintenance

    Each step supports safety, durability, and efficiency. Galvanized iron and advanced steel coatings help resist corrosion, especially in large-scale solar farms. Mechanical testing, modular design, and regular inspections keep your system reliable and cost-effective.

    Key Takeaways

    • Start with a thorough site survey and feasibility check to ensure your location supports safe and efficient PV panel installation.

    • Choose the right steel type and coatings based on your environment to prevent corrosion and extend the structure's lifespan.

    • Perform detailed soil analysis and select a foundation that matches your ground conditions to avoid structural problems.

    • Use certified materials and proper fasteners during installation to ensure stability, safety, and long-term durability.

    • Schedule regular inspections and maintenance to catch issues early, protect your investment, and keep your system running efficiently.

    Planning & Site Assessment

    Site Survey

    You start your project with a detailed site survey. This step helps you understand the physical conditions and limitations of your installation area. Follow these best practices:

    1. Visit the site and inspect the roof or ground. Measure the framing elements and check their condition.

    2. Gather structural data. Sometimes, you need laboratory tests to confirm the strength of steel or other materials.

    3. Choose the right racking and attachment systems. Decide if you need ballasted, fully attached, or hybrid systems based on your findings.

    4. Look for ways to increase structural capacity. You might redistribute loads or reinforce weak areas.

    5. Work with experienced structural engineers. Their expertise ensures safety and compliance.

    6. Document everything. Create clear reports to guide your next steps.

    A thorough site survey sets the foundation for a safe and efficient installation.

    Feasibility & Location

    You must check if your site is suitable for solar panels. Consider these factors:

    • Structural integrity: Make sure the roof or ground can support the panels.

    • Shading: Identify trees, buildings, or other objects that block sunlight.

    • Orientation and tilt: South-facing roofs with the right tilt capture the most sunlight.

    • Roof material and condition: Ensure compatibility with mounting systems.

    • Electrical and structural needs: Plan wiring and mounting carefully.

    • Local codes and permits: Follow all regulations to avoid delays.

    • Energy demand: Analyze your energy use and peak needs.

    • Financial viability: Calculate costs, savings, and possible incentives.

    • Grid connection: Check if you can connect to the grid and use net metering.

    These checks help you avoid costly mistakes and ensure your project succeeds.

    Common Pitfalls

    Many projects face issues during planning and site assessment. Watch out for these common mistakes:

    1. Skipping a professional site assessment. This can lead to shading problems and poor system sizing.

    2. Ignoring local regulations and permits. This often causes delays and fines.

    3. Choosing incompatible equipment. This reduces efficiency.

    4. Failing to prepare the roof or ground. This leads to expensive repairs later.

    5. Overlooking maintenance planning. This affects long-term performance.

    6. Using poor wiring or connections. This creates safety hazards.

    Tip: Always involve certified professionals and follow a checklist to avoid these pitfalls.

    Design & Engineering

    Structural Loads

    You must start by understanding the different loads your steel structure will face. These include the weight of the panels and mounting equipment (dead loads), temporary forces like snow or maintenance workers (live loads), wind pressure, and seismic activity. The American Society of Civil Engineers (ASCE) 7-10 standard gives you the minimum design loads for these factors. Always check local building codes, as they may have extra requirements for your area.

    Material choice matters. Cold-formed steel works well for strength and cost. Galvanized steel resists corrosion in harsh weather. Stainless steel is best for coastal areas with salty air. You need to match your material to your climate to keep your structure safe and long-lasting.

    Tip: Calculate all loads carefully before you design your Steel Structure for PV Panel. This step prevents damage from storms, snow, or earthquakes.

    Modeling & Codes

    You must follow strict codes and use advanced modeling tools to ensure safety. Here’s a step-by-step approach:

    1. Review original building plans and inspect the site with a qualified engineer.

    2. Use non-destructive testing to check the roof or ground.

    3. Choose high-strength bolts and corrosion-resistant materials.

    4. Work with a licensed structural engineer for stamped drawings.

    5. Obtain permits with full structural and electrical plans.

    6. Meet wind and seismic requirements using ASCE 7 and the International Building Code (IBC).

    7. Follow the National Electrical Code (NEC) Article 690 for wiring and fire safety.

    8. Use modeling software like RFEM 6 for advanced analysis.

    9. Prepare clear construction documents, including 3D models and detailed notes.

    Note: Fire safety and watertightness are critical. Always include these in your design and documentation.

    Design Pitfalls

    Many projects fail because of common design mistakes. Watch for these issues:

    • Ignoring local building codes can lead to unsafe structures or legal trouble.

    • Underestimating wind, snow, or seismic loads risks collapse.

    • Choosing the wrong material causes rust or failure.

    • Skipping maintenance planning shortens system life.

    • Focusing only on low price reduces quality and increases long-term costs.

    • Overlooking ease of installation makes the project slower and more expensive.

    • Not planning for future upgrades limits flexibility.

    To avoid these pitfalls:

    • Plan regular inspections and maintenance.

    • Select materials that match your climate.

    • Use modular designs for easy installation and upgrades.

    • Balance cost with durability and safety.

    Remember: Careful design and code compliance keep your Steel Structure for PV Panel safe, durable, and efficient for years.

    Material Selection & Procurement

    Steel Type & Coating

    You need to choose the right steel and coating for your PV panel structure. Your choice affects strength, durability, and long-term costs. The table below compares common options:

    Steel Type

    Coatings / Treatments

    Advantages

    Typical Uses

    Galvanized Steel

    Hot-dip galvanization (G90-G180)

    High corrosion resistance, cost-effective

    Ground mounts, beams, earth screws

    Stainless Steel

    N/A

    Superior durability, excellent corrosion resistance

    Coastal or industrial sites

    Cold-Formed Steel

    Galvanized coatings

    Lightweight, easy to fabricate, strong

    Rooftop and carport systems

    Carbon Structural Steel

    Galvanized post-processing

    Strong, balanced cost and performance

    Durable structural frameworks

    You should also consider Q235B steel for large arrays. It offers high strength but needs protective coatings. AL6005-T5 aluminum is lighter and resists corrosion naturally, but costs more. For harsh or coastal environments, select thicker coatings (at least 100 μm) or advanced options like marine epoxy. These choices extend the life of your Steel Structure for PV Panel and reduce maintenance.

    Procurement Tips

    To get high-quality steel, you must plan your procurement process carefully:

    • Define your project scope and material needs before you start.

    • Build relationships with trusted suppliers to secure reliable materials.

    • Focus on quality control at every stage. Inspect materials before accepting them.

    • Monitor market prices and understand regional cost drivers.

    • Coordinate logistics to avoid delays and ensure timely delivery.

    • Streamline your workflow to keep purchasing efficient.

    Steel prices can change due to market trends and supply chain issues. By staying informed, you can balance quality and cost for your project.

    Tip: Always prioritize supplier reliability and material quality over the lowest price.

    Material Pitfalls

    You can avoid costly mistakes by watching for these common pitfalls:

    1. Choosing the wrong steel or coating for your environment leads to early corrosion.

    2. Using cold-rolled steel with thin coatings may save money at first, but it often fails in wet or coastal areas.

    3. Skipping quality checks can result in substandard materials that compromise safety.

    4. Failing to re-coat galvanized steel in corrosive areas increases maintenance costs.

    5. Ignoring advanced coatings like zinc-dust primers or marine epoxy can double your repair costs over time.

    Investing in proper coatings and quality materials extends the service life of your PV panel supports. This approach saves you money and effort in the long run.

    Foundation & Soil Preparation

    Foundation & Soil Preparation
    Image Source: pexels

    Soil Analysis

    You need to start with a thorough soil analysis before building any foundation. This step helps you choose the right foundation type and avoid costly mistakes later. Use these effective methods to assess soil suitability:

    1. Conduct bore tests to collect subsurface soil samples.

    2. Perform soil condition tests to check if excavation is possible.

    3. Measure soil acidity to decide if you need extra protective coatings.

    4. Determine N values to understand the density of sandy soils and the consistency of clay soils.

    5. Check for groundwater, which can affect stability.

    6. Assess soil forces that may impact the foundation.

    These steps give you a clear picture of the ground conditions and help you plan the next phase.

    Foundation Build

    After analyzing the soil, select a foundation that matches your site’s needs. Here are common foundation types and their best uses:

    Foundation Type

    Best Soil Conditions

    Key Considerations

    Durability/Protection

    Driven Piles

    Clay, gravel, dense sand

    Quick to install, may need pull tests

    Hot dip galvanized, >40 years life

    Helical Piles

    Loose sand, high water table

    Rotated into ground, good for poor cohesion soils

    Zinc coating for corrosion resistance

    Earth-Screws

    Rocky or ledge, predrilled soils

    Screwed into predrilled holes, higher installation cost

    Zinc coating for corrosion resistance

    Ballasted Foundations

    Loose sand, high water table, high refusal

    Use precast or poured concrete, no deep embedment needed

    Concrete, thinner galvanization

    Choose driven steel piles for soft soils or coastal areas. Use concrete piles for rocky terrain or heavy loads. Helical piles and ground screws work well in loose or wet soils. Ballasted foundations suit sites with high water tables or where deep digging is not possible.

    Foundation Pitfalls

    Many projects run into trouble during foundation work. Watch for these common pitfalls:

    1. Foundation level deviation from poor measurement or untrained workers.

    2. Weak foundation treatment, such as skipping reinforcement in soft soils.

    3. Uneven settlement due to bad backfill compaction or mixed soil quality.

    These issues can cause structural instability, cracks, or even collapse. To prevent them:

    • Use high-precision measuring tools and check them often.

    • Train your team and follow standard procedures.

    • Review measurements and double-check before moving forward.

    • Tailor your foundation treatment to the site’s geology.

    • Reinforce weak soils with piles or compaction.

    • Control backfill quality and test each layer for moisture and compaction.

    Tip: Careful soil analysis and strict construction standards keep your foundation safe and long-lasting.

    Steel Structure for PV Panel: Installation

    Steel Structure for PV Panel: Installation
    Image Source: unsplash

    Mounting Structure

    You begin the installation by preparing the foundation and placing the mounting columns. Hammer the columns directly into the ground after you finish site measurement and soil testing. If the soil is too hard or rocky, use spiral piles that screw into the ground. For sites where piles are not suitable, construct precast cement foundations and bolt the brackets in place. In some cases, pour cement directly with the bracket for a high-strength base. Always set the mounting structure facing south in the northern hemisphere and adjust the tilt to match your latitude. This direction and angle help you capture the most sunlight. Preassemble the main steel structure, then install the front and back bar components. Make sure the structure sits on a stable surface to withstand wind and rain.

    Tip: Maintain enough space between rows—about three times the module height—to prevent shading and allow for maintenance.

    Fastening & Drilling

    You need to use the right fasteners and drilling techniques to ensure stability. Stainless steel bolts and nuts work best because they resist corrosion. Lag bolts secure mounting bases to roofs, especially with asphalt shingles. Self-tapping screws let you attach brackets to metal surfaces without pre-drilling, which saves time. Use hex bolts and nuts for strong connections between rails and brackets. Roofing screws are designed to penetrate roofing materials while keeping the roof watertight. Clamps and T-bolts hold the solar panels to the rails. For ground mounts, ground screws or piles secure the structure without concrete. Always use cable clips to organize and secure wiring, reducing hazards.

    Fastener Type

    Application

    Key Point

    Lag bolts

    Mounting bases to roofs

    Heavy loads, outdoor use

    Self-tapping screws

    Brackets to metal surfaces

    No pre-drilling needed

    Hex bolts and nuts

    Connecting rails or brackets

    Strong mechanical connection

    Roofing screws

    Mounting panels to roofs

    Maintains roof integrity

    Clamps/T-bolts

    Holding panels to rails

    Secure and adjustable

    Installation Pitfalls

    Many projects face problems during installation. You can avoid these common pitfalls:

    • Failing to align panels properly can reduce energy output by up to 20%.

    • Overloading the roof or using heavy mounting systems without reinforcement risks structural failure.

    • Using the wrong fasteners or materials leads to corrosion and long-term damage.

    • Skipping professional installation may result in code violations, fines, or unsafe systems.

    • Ignoring regular maintenance causes loose fasteners, corrosion, and system degradation.

    • Poor communication with engineers or building owners can delay problem-solving.

    Note: Always use certified mounting systems and corrosion-resistant materials like galvanized or stainless steel. Schedule regular inspections to catch issues early and keep your Steel Structure for PV Panel reliable for years.

    Panel Mounting & Electrical

    Panel Placement

    You need to position your solar panels carefully to maximize energy output and maintain structural safety. Start by optimizing the tilt angle. This angle should match your latitude to capture the most sunlight throughout the year. Adjust the tilt if you want to prioritize summer or winter production. Always check that the tilt does not overload your steel framework.

    Space the panels with enough distance between rows. This spacing prevents shading and allows wind to pass through, which reduces wind resistance and balances the load on your structure. Use corrosion-resistant fasteners and vibration dampeners to keep the mounting stable. Always follow building codes like the International Building Code (IBC) and ASCE 7 for wind and seismic safety. Regularly inspect the mounting hardware and drainage to prevent water buildup and rust.

    Tip: Use lightweight, insulated panels when possible. These panels reduce the load on your structure and improve energy efficiency.

    Wiring & Grounding

    You must install wiring and grounding with care to ensure safety and system reliability. Follow these steps:

    1. Bond each PV module frame to the racking system using the manufacturer’s instructions.

    2. Use #6 AWG bare copper wire for grounding conductors exposed to damage. Inside conduit, you can use smaller wire.

    3. Ground all metal conduit with grounding bushings.

    4. Connect the equipment grounding conductor to the main service panel and the building’s main ground.

    5. Check your inverter or charge controller for specific grounding needs.

    6. Use grounding clips and lugs that pierce anodized layers for good conductivity.

    7. Protect ground wires from physical damage by running them in conduit.

    You should also create redundant grounding paths by connecting both the PV array and the building shell to ground rods. This approach increases fault tolerance and safety.

    Electrical Pitfalls

    Many electrical issues can cause system failure or safety hazards. Watch for these common mistakes:

    • Skipping proper bonding between panels and racking can lead to shock hazards.

    • Using undersized or unprotected ground wires increases fire risk.

    • Failing to ground all metal parts can cause inspection failures.

    • Not replacing single-use grounding clips after removal reduces reliability.

    • Ignoring inverter grounding requirements can result in ground faults.

    Note: Always follow manufacturer instructions and local codes. Schedule regular inspections to catch wiring or grounding problems early.

    Inspection & Maintenance

    Inspection

    You need to inspect your PV panel system regularly to ensure safety and performance. Start by checking that the installation matches the manufacturer’s specifications and local authority requirements. Always verify the correct sizing of equipment, including grounding, breaker size, wire gauge, and conduit type. Make sure disconnect switches work and are easy to reach in emergencies. Safety labels should clearly identify all system parts. Schedule inspections with your local authority and utility provider. Check fire pathways and roof setbacks as shown in your plans. Provide safe access for inspectors, such as ladders for roof systems. Confirm that the system matches the permitted design. If you made changes, update your permits. After installation, join your installer for a walkthrough to review system performance.

    Tip: Always use certified professionals for inspections and follow the National Electrical Code to meet safety standards.

    Maintenance

    You can extend the life of your PV system with routine maintenance. Inspect for early signs of corrosion or coating damage using visual checks and ultrasonic tools. Before storms, tighten all bolts and fasteners to keep the structure stable. Apply advanced anti-corrosion treatments and use UV-resistant coatings to protect steel from sun and heat. In snowy areas, use anti-snow coatings and remove snow buildup to prevent excess weight. Monitor ground movement with sensors and reinforce anchoring if needed. Smart monitoring systems can alert you to stress points or alignment shifts. Choose corrosion-resistant materials for repairs to ensure long-term durability.

    • Regularly check for:

      • Rust or peeling coatings

      • Loose or missing fasteners

      • Debris buildup on panels or structure

      • Signs of ground movement

    Long-term Pitfalls

    You should watch for issues that can reduce system efficiency or cause damage over time. Hot spots from cell failure, shading, or mismatched cells can overheat panels and increase fire risk. Microcracks and snail trails from impacts or thermal stress lower energy output. Broken glass or torn backsheets allow moisture in, which shortens panel life. Environmental debris like leaves or snow can block sunlight and cause negative effects on cells. Over the years, panels may lose efficiency due to light-induced or temperature-induced degradation. Use infrared thermography and electroluminescence imaging to detect hidden defects early.

    Note: Regular inspection and maintenance help you avoid costly repairs and keep your PV system running safely for years.

    You can achieve a reliable Steel Structure for PV Panel installation by following each of the 12 steps in this guide. Use the checklist to avoid common mistakes and keep your system performing well for years. For complex projects, seek out resources like virtual reality training, PV design tools, and certification programs. You may face challenges such as supply chain issues or weather delays, so ongoing learning and working with professionals help you manage risks and stay up to date.

    FAQ

    What type of steel works best for PV panel structures?

    You should use galvanized steel for most environments. Stainless steel works well in coastal areas. Always match the steel type to your site’s climate and corrosion risks.

    How often should you inspect your steel PV structure?

    Inspect your system at least twice a year. Check after severe weather events. Look for rust, loose bolts, and any signs of damage.

    Can you install PV panels on any roof type?

    Not every roof supports PV panels. You need to check the roof’s strength, material, and angle. Consult a structural engineer before installation.

    What is the most common mistake during installation?

    • Skipping professional site assessment

    • Using the wrong fasteners

    • Ignoring local codes

    You can avoid these mistakes by following a detailed checklist and working with certified professionals.

    See Also

    Essential Structural Design Considerations For ESTEL Outdoor Telecom Cabinets

    Important Maintenance Advice For ESTEL Outdoor Telecom Cabinets

    Guide To Choosing And Installing Pole-Mounted Telecom Cabinets Safely

    Safety Features Of Custom-Built ESTEL Outdoor Telecom Cabinets

    A Comprehensive Look At ESTEL Outdoor Telecom Cabinet Structures

    Accelerate your organic traffic 10X with QuickCreator